|
|

Carbon build up on valves before repair876 views
|
|

BEFORE AND AFTER948 viewsNOTE BAKED ON DEPOSITS/OIL ASH BEFORE AND AFTER,CLEAN VALVE IS BEHIND ,ON REQUEST WE POLISH THEM TO MIRROR FINISH TO AIDE IN CYLINDER FILLING
|
|

In dire need of repairs ,work in progress for BMW 318 is with 320 000 km in it910 viewsBefore cylinderhead rebuilt see pictures for after.By the way the rest of the engine is perfect, it's true has been on a steady diet of premium synthetic oil
|
|

BMW CYLINDER HEAD AFTER REPAIRS ,BEFORE INSTALLATION962 viewsPLEASE NOTE REBUILT CYLINDER HEAD ON A BMW ENGINE JUST BEFORE FINAL INSTALLATION ,THIS ENGINE HAD 320
THOUSAND KILOMETERS IN IT'S BOTTOM END LOOKS MINT, ENGINE HAS BEEN RUNNING ON PREMIUM SYNTHETIC MOTOR OIL AND HAS BEEN DRIVEN ON THE RACE TRACK JUST UNTIL RECENTLY ,IN FACT BELONGS TO A EXECUTIVE MEMBER OF THE BMW CLUB OF ONTARIO ,MAINTENANCE PAYS.
|
|

PISTON VIEW BEFORE AND AFTER884 viewsCLEANED PISTONS EXCEPT #2, BEFORE AND AFTER
|
|

Work in progress before and after .BMW 318-I943 viewsNote carbon deposit from leaky valve seals .
|
|

1159 views
|
|

Audi A-6 2.8 , waterpump leak + timing belt replacement.977 views
|
|

Close view, note pink coolant leak under the water pump,AUDI-A6 2.8911 views
|
|

VW 1.8t timingbelt work in progress.899 viewsPlease note the the amount of work required for standard timingbelt replacement on VW Passat 1.8 turbo engine
|
|

VW PASSAT 1.8 TURBO TIMINGBELT967 viewsTiming belt service/maintenance on1.8 turbo Passat.
|
|

BMW V8 OIL SLUDGE765 viewsEXTENDED OIL CHANGES HAS IT'S NEGATIVES THIS IS ONE OF THEM.
|
|
| 203 files on 17 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
15 |  |
|